Contact us for more info
Contact with us through our representative or submit a business inquiry online.
Energy Optimization Furnace

Due to use of 80 to 85% hot metal approximately 10% DRI and plant return scrap, primary steel from EOF is virgin steel with low tramp element low phosphorus and low oxygen potential. Oxygen blowing through submerged tuyeres, supersonic lance and atmospheric injection.
| Parameter | Description |
|---|---|
| Technology | Minitec, Brazil |
| Size of the furnace | 35 MT |
| Hot metal | 80% to 85% |
| Tap to tap time | 40 to 50 min |
| No of bottom Shells | 1+1 |
| Capacity | 3,00,000 TPA |



